Construction of Flood Control Structure, Ala River (Allah Bridge - Mapantig), Isulan, Sultan Kudarat
Construction of Flood Control Structure, Ala River (Allah Bridge - Mapantig), Isulan, Sultan Kudarat is a DPWH-tracked public work in ISULAN (CAPITAL) (SULTAN KUDARAT), SULTAN KUDARAT, Region XII. Reported contract value: ₱44,960,045.66. Status: Reported complete (DPWH). Contractor on record: CS CONST AND SUPPLY INC FORMERLY: CS CONST AND SUPPLY. Figures trace to sumbong.
Total Contract Cost

